Description and Key Features
Structural Design and Construction Supervision of the Sheet pile shoring systems for the 10m deep Intake Structure at the national Waste Water Treatment Plant (NWWTP).
Location
Bugolobi, Kampala
Gross Floor Area
N/A
Duration
2020-2022